Back to the Home Page
Enter width & length in metres or mm.
7800 mm = 7.8 m. We convert automatically when “mm” is selected.
For edging/trims – calculates pieces including waste.
Estimate DTp1 / MOT Type 1 tonnage.
Formula: area × (depth/1000) × 2.12 (bulk density t/m³).
Estimates sharp sand & cement for a 50 mm bed.
Per 20 m² → ~1800 kg sharp sand & ~319.2 kg cement.
Large enough to cope, small enough to care.
Birchover Reclamation Ltd Sandyhill Business Park, Off Porters LaneMiddleton, DE4 4LR
01629 828352
07495 799573